Other projects
Dam repair, spillway rehabilitation, slope stabilisation and tunnel grouting across the hydropower projects of Uttarakhand and J&K.
- Koteshwar
- 36 months
- Pipalkoti TBM
- 1.5 years
- Sewa II tunnel
- 10 km
Tapovan Vishnugad HPP
RC dam repairRebaring and micro concrete
Repair and structural strengthening of the dam's reinforced concrete: damaged concrete cut out, new steel coupled in, and the section rebuilt in micro concrete and epoxy mortar.
- Loose concrete removed
- Rebaring with couplers and shear connectors
- High-strength micro concrete
- Epoxy mortar finish
Tapovan, photographed
-
Structure under repair -
Damaged concrete removed -
Couplers on the new reinforcement -
Completed repair
Maneri Bhali Stage-I Dam
Spillway and roller bucketLean season, under water
Damaged seal beams, heavy silt erosion and deep cavities in the spillway and roller bucket, repaired under water in the lean season.
- Profile matching in M80 concrete
- Rebaring and epoxy grouting
- MS plate liners for spillway and roller buckets
- Seal beams and silt-eroded cavities rebuilt
Maneri Bhali, photographed
-
Spillway repair -
Work in progress
Koteshwar Hydroelectric Project
36 monthsLeft bank, up to 200 m
Stabilisation of the left bank up to 200 m above the riverbed, then grouting and epoxy treatment at the power intake and turbine bases.
- 20,000+ sqm secured with rock bolts and chain link
- Shotcreting of the slope
- Epoxy and PU grouting at the power intake
- Turbine base plates and construction joints treated
VPHEP Pipalkoti: freeing the TBM
From 20211.5 years
In 2021 the tunnel boring machine at VPHEP stuck fast in a fragile section of the HRT. Over a year and a half CPS drilled and grouted the sandy ground around it until the TBM could move again.
- Consolidation drilling in fragile, sandy strata
- Polyurethane grouting
- Microfine cement grouting
- Colloidal silica injection
Pipalkoti, photographed
-
Fragile strata at the TBM -
Colloidal silica -
Consolidation operations -
Grouting inside the tunnel -
Drilling for consolidation
Sewa II HEP, Jammu & Kashmir
201010 km, 3.3 m diameter
Repair of a 10 km head race tunnel only 3.3 m across, with severe leakage. Machinery went in by hand through the few entry points.
- Heavy machinery carried in by hand from few entry points
- PU grouting to stop severe leakage
- Epoxy mortar repair of the HRT
Across India
Expressways, pipelines, refineries, treatment plants and buildings: the civil and protective work that runs alongside the hydropower.
- Nagpur–Mumbai ExpresswayPassive fire protection, package 14
- Rajpura Thermal PowerCivil works, site grading and a minor bridge
- Nagloi CETP, DelhiStructural treatment of 12 and 24 MLD plants
- GAIL gas pipeline294 km of joint coating, Jaipur to Loni
- HMEL Bhatinda RefinerySpecialised insulation
- AIIMS BhopalPU foam insulation and PVC membrane waterproofing