Dam repair, spillway rehabilitation, slope stabilisation and tunnel grouting across the hydropower projects of Uttarakhand and J&K.

Koteshwar
36 months
Pipalkoti TBM
1.5 years
Sewa II tunnel
10 km
Scroll to the work

Tapovan Vishnugad HPP

RC dam repairRebaring and micro concrete

Repair and structural strengthening of the dam's reinforced concrete: damaged concrete cut out, new steel coupled in, and the section rebuilt in micro concrete and epoxy mortar.

  • Loose concrete removed
  • Rebaring with couplers and shear connectors
  • High-strength micro concrete
  • Epoxy mortar finish
Rebaring
Micro concreting

Tapovan, photographed

  • Structure under repair
  • Damaged concrete removed
  • Couplers on the new reinforcement
  • Completed repair

Maneri Bhali Stage-I Dam

Spillway and roller bucketLean season, under water

Damaged seal beams, heavy silt erosion and deep cavities in the spillway and roller bucket, repaired under water in the lean season.

  • Profile matching in M80 concrete
  • Rebaring and epoxy grouting
  • MS plate liners for spillway and roller buckets
  • Seal beams and silt-eroded cavities rebuilt
Roller bucket repair
Completed works

Maneri Bhali, photographed

  • Spillway repair
  • Work in progress

Koteshwar Hydroelectric Project

36 monthsLeft bank, up to 200 m

Stabilisation of the left bank up to 200 m above the riverbed, then grouting and epoxy treatment at the power intake and turbine bases.

  • 20,000+ sqm secured with rock bolts and chain link
  • Shotcreting of the slope
  • Epoxy and PU grouting at the power intake
  • Turbine base plates and construction joints treated
Slope stabilisation on the left bank
Shotcreting

VPHEP Pipalkoti: freeing the TBM

From 20211.5 years

In 2021 the tunnel boring machine at VPHEP stuck fast in a fragile section of the HRT. Over a year and a half CPS drilled and grouted the sandy ground around it until the TBM could move again.

  • Consolidation drilling in fragile, sandy strata
  • Polyurethane grouting
  • Microfine cement grouting
  • Colloidal silica injection
PU pumping
The TBM released

Pipalkoti, photographed

  • Fragile strata at the TBM
  • Colloidal silica
  • Consolidation operations
  • Grouting inside the tunnel
  • Drilling for consolidation

Sewa II HEP, Jammu & Kashmir

201010 km, 3.3 m diameter

Repair of a 10 km head race tunnel only 3.3 m across, with severe leakage. Machinery went in by hand through the few entry points.

  • Heavy machinery carried in by hand from few entry points
  • PU grouting to stop severe leakage
  • Epoxy mortar repair of the HRT
Inside the Sewa II HRT

Across India

Expressways, pipelines, refineries, treatment plants and buildings: the civil and protective work that runs alongside the hydropower.

Column and slab work on a building in Noida
  • Nagpur–Mumbai ExpresswayPassive fire protection, package 14
  • Rajpura Thermal PowerCivil works, site grading and a minor bridge
  • Nagloi CETP, DelhiStructural treatment of 12 and 24 MLD plants
  • GAIL gas pipeline294 km of joint coating, Jaipur to Loni
  • HMEL Bhatinda RefinerySpecialised insulation