HYDROPOWER & RIVER DREADING
Preserving the ecosystem
After gaining experience and expertise, and profitably reaping the fruits of diversification, the portfolio of CPS has a variety in terms of both the activities undertaken and the clients served. After having served the client profile such as Government & Semi Government Departments, Public Sector Undertakings, Turnkey Projects Operators and Promoters & Builders by undertaking a variety of activities such as Civil, Mechanical, Infrastructure Development & Turnkey operations. CPS now enjoys the reputation of being a reliable partner for all projects. Clients of CPS appreciate its prompt service and commitment to long-term relationships.
Badrinath Dham
Construction of River Front Development Work (F1, G1) and
Pedestrian Bridge at Shri Badrinath Dham under Master Plan
- Construction of a coffer dam for river diversion Front
- Excavation of river fronts
- Construction of embankment
- Cutting of boulders using a wire saw machine
- Pouring of plum concrete underwater (dry method)
- Cutting, binding, and fixing of reinforcement steel
- Formwork for foundation
- Backfilling of foundations
- Construction of a retaining wall and gabion wall
- Rock anchoring of boulders at pedestrian bridge location
Tehri Dam
River Dredging & Construction of Baffle Wall between Tehri
Dam Spillway to PSP TRT Outlet (HCC-THDCIL
- Drilling, grouting, surface treatment and repairing with spray mortar
and microfine cement at HRT3 and HRT4 of PSP Tehri Hydro Power
Corporation at Tehri. - Repairing with microfine cement at service bay galleries at PSP Tehri
Hydro Power Project. - Drilling and grouting at TRT PSP Tehri Hydro Power Project.
- Drilling and grouting with microfine cement and PU injection at TRT
outfall at Tehri Hydro Power Project. - Repairing concrete lining of Tunnel T-1, T-2, T-3, T-4 with epoxy mortar
and fiber glass cloth, Tehri Dam. - Epoxy treatment of inspection gallery, Tehri Dam.
- Repairing of spillway with epoxy mortar, Tehri Dam.
- PU injection grouting of ILO shaft, Tehri Dam.
- Surface preparation & epoxy coating at draft tube & spiral casting,
Tehri Dam. - Treatment of slope at abutment, Tehri Dam.
- Chemical grouting in gate shaft, treatment of old treatment reach of
T-1, T-2 with epoxy mortar, Tehri Dam.
Epoxy Treatment work in Intake Structure 1 &2 at EL 745 M of TehriHPP.
Hailang Dam
- Slab cutting of diversion tunnel using wire saw machine
- Construction of coffer dam for water diversion
- Installation of working platform inside tunnel with running water
- Drilling and fixing of shear connectors
- Chipping and surface treatment
- Drilling, anchoring, and fixing of reinforcement steel
- Repairing gate groove using:
- Underwater and above-water chemical grouting
- Underwater and above-water micro concrete
- Epoxy putty
- Epoxy mortar